Case Studies

Blum UK, Milton Keynes


Completed: January 2023

Client: Parkway MK Ltd

Occupier: Blum UK - https://www.blum.com/gb/en/

Building overview: Blum Phase 4 was a refurbishment of the second floor offices and extension of lift and staircase.

Mandek services: Our contract was for the design and build for the mains distribution, containment, general & emergency lighting, fire alarm, disabled refuge, power, heating, ventilation and air conditioning


We developed comprehensive designs for electrical and mechanical systems, including schematic, equipment layouts, and system specifications. Evaluating and selecting appropriate electrical and mechanical equipment to meet project requirements and coordinating the procurement process and ensuring that all electrical and mechanical systems are integrated and working together properly, and commissioning the systems to ensure proper functioning.


Plot 6000, Westcott Venture Park, Nr Aylesbury


Completed: July 2022

Client: Parkway MK Ltd

Occupier: for future occupation

Building overview: A new industrial warehouse unit with attached offices.

Mandek services: We carried out the Design and Build which involved the lighting layout(internal, external and emergency lighting), fire alarm systems, power and mains distribution boards, containment, heating, cooling and air conditioning.


The creation of a detailed plan was necessary for the installation, including the layout, specifications, and requirements for electrical and mechanical systems. This stage involved working with architects, engineers, and other professionals to ensure that the design is safe, efficient, and compliant with regulations.


Furthermore, we installed the electrical and mechanical systems, which included wiring, piping, and other tasks required to connect the systems to the building for testing and commissioning: This stage involved testing the systems to ensure that they are functioning correctly and commissioning the systems to ensure that they meet the required standards and regulations.


W&H PEACOCK, ST NEOTS


Completed: November 2022

Client: Parkway MK Ltd

Occupier: W&H Peacock - https://www.peacockauction.co.uk/

Building overview: New Auction sales building including the office area, sales area and an existing sales warehouse to the rear.

Mandek services: We carried out the Design and Build electrical contract works for this building. Our works included the design, installation and commissioning of Mains Distribution, Small Power (to offices, sales area, warehouse and Café area), LED Lighting to the offices, Emergency Lighting, Fire Alarm Systems, Disabled Alarms and Cable Containment Systems for the above.


DRONE PORT, WESTCOTT, AYLESBURY


Completed: August 2022

Client: Satellite Applications Catapult

Occupier: Satellite Applications Catapult - https://sa.catapult.org.uk/

Building overview: 3 new standalone base buildings complete with a car park, a portacabin and the Landlord's estate road and feeder pillar formed part of our contract works..

Mandek services: We designed and installed the general & emergency lighting in the warehouses, power, data network, fire alarm system, CCTV, security alarm and Cable Containment Systems for the above.


THORN TURN, HOUGHTON REGIS


Completed: August 2022

Client: Parkway MK Ltd

Occupier: Various

Building overview: 6 new industrial units, car parks, service yards and Landlord's Estate Road. A base building office, complete with Reception, WCs, Locker room, Shower, Staircases, Corridors and Warehouse were provided in each unit.

Mandek services: We were employed on a design and build basis for the electrical and mechanical packages in all units and for the external lighting in the car park areas and access road. Within the Cat B fit-out, we provided a full LED lighting scheme, a fully compliant emergency lighting system, a category L1 fire alarm system, and all other power and distribution services. From the mechanical point of view we installed new air conditioning systems and supply of fresh air through ventilation. The finish of the project was very good, both from an electrical point of view and a mechanical point of view.


OLNEY PARK, WARRINGTON, OLNEY


Completed: April 2022

Client: Parkway MK Ltd

Occupier: Case Ltd - https://casesecurity.co.uk/

Building overview: A small industrial unit which includes various offices, canteen, toilets and a warehouse

Mandek services: We developed a detailed design for the building services systems. The design incorporated the lighting design and calculations, power distribution system, containment system, and fire alarm system in compliance with British Standards.


The external lighting design would provide illumination for the parking lot, walkways, loading docks, and other areas around the building. The lighting fixtures were selected for their energy efficiency and ability to withstand outdoor conditions. The illumination levels were carefully calculated to ensure adequate lighting for safety and security purposes, while also minimizing light pollution.


UNITS 1-4 - CATALYST, BICESTER



Completed: February 2022

Client: Parkway MK Ltd

Occupier: Various

Building overview: This project consists of four separate units, each of which includes an open plan office, toilets, and warehouses.to provide secure storage for goods and equipment, with easy access for loading and unloading.

Mandek services: The scope of work included lighting design and calculations, supply power for equipment and devices, containment and fire alarm system.


To begin with, we conducted a thorough lighting design and calculation, considering layout, and intended use. We also took into account the desired ambiance, functionality, and energy efficiency. The resulting lighting design plan included various types of fixtures, including LED and fluorescent lighting, to ensure that the building is properly illuminated.


We also designed the power distribution system, which involved calculating the building's power requirements and determining the appropriate distribution panels and switchgear. We also ensured that the system met all necessary safety and regulatory standards.


Additionally, in terms of containment, we designed a comprehensive containment system to house the wiring and cabling throughout the building. The containment system included cable trays, conduit, and trunking, which were strategically placed to ensure ease of maintenance and accessibility.

PLOTS 2, LINK 9, BICESTER


Completed: August 2018

Client: Parkway MK Ltd

Occupier: Various

Building overview: 7 new industrial units, car parks, service yards and Landlord’s Estate Road. A base build office, complete with Reception, WCs, Staircases and corridors were provided in each unit. LED Roadway lighting was installed to the Landlord’s estate road, complete with power supplies to Drainage Pump, Interceptors and Cold-Water Boost Tanks.

 

Mandek services: We were awarded the design and build contract for the electrical works of 7 industrial units complete with offices. The Landlord’s estate road and common areas also formed part of our contract works.

 

Although the units were a very similar layout and design all units were unique in their own way. This meant we were required to produce 7 complete sets of designs, calculations and drawings, complete with our Technical Submission for the project.

 

The Main Contractor’s programme meant our site management had to work closely with other trades to ensure our works ran smoothly and caused no hold-ups. We split our installation works into separate visits such as containment and void detection, first fix wiring, installation of conduits in walls, second fixing and testing/commissioning. Our site management kept the Main Contractor informed on our progress in all units through the program and as a result our works ran smoothly and caused no disruptions to other trades and contractors.

PLOTS 3, LINK 9, BICESTER


Completed: July 2018

Client: Parkway MK Ltd

Occupier: British Bakels - http://www.britishbakels.co.uk/index.cfm

Building overview: New industrial unit split in to 2 units. Base build offices to each unit along with a transport office in Unit 3B.

Mandek services: We were awarded the design and build contract for the electrical works of units 3A and 3B. There was a requirement to achieve BREEAM Very Good on this scheme and this was met through our design and installation.

 

The incoming supply to Unit 3B was terminated directly to the Main Panel that we supplied and installed as part of our works. This required careful planning and co-ordination between Mandek and the DNO. The electricity supply for Unit 3A was sub-metered from the main panel in 3B and sub-main cabling installed at high level on cable tray.

 

The project was delivered ahead of the Construction Program and on budget. We carried out witness testing with the Electrical Consultant 2 weeks before handover. Operating and Maintenance manuals were also issued 2 weeks ahead of project completion. Following the completion of the Witness Testing the Electrical Consultant issued his Completion Letter and stated the design, installation and commissioning of the electrical services were carried out in a professional manner. He also requested photographs of our installation to show his colleagues.

WOLVERTON MILL, WOLVERTON



Completed: January 2018

Client: Parkway MK Ltd

Occupier: for future occupation

Building overview: Large, architecturally pleasing industrial unit, with office space and external car parking/servicing.

Mandek services: We were employed on a design and build basis for the electrical package, including mains distribution, containment, general & emergency lighting, fire alarm, power, external lighting and external power.

 

The lighting scheme, which was fully designed in-house, incorporated 600x600 fittings, downlights, wall lights and architectural pendants in the reception. The scheme was designed to meet all client requirements and industry standards, whilst still being low-energy and low-cost to run.

 

The electrical installation included several sustainable elements that contributed towards the building achieving BREEAM Excellent – low energy lighting, sustainable external light, sub-metering of electrical supplies, electrical vehicle charging.

ASTON 41, ASTON CLINTON


Completed: December 2017

Client: Parkway MK Ltd

Occupier: Mercedes Benz - https://www.mercedes-benz.co.uk/passengercars.html

Building overview: A large industrial unit with office space, a front car park and rear service yard.

Mandek services: Our contract was for the design and build for the mains distribution, containment, general & emergency lighting, fire alarm, disabled refuge, power, data and external lighting.

 

Within the offices, a network of underfloor busbar and floor boxes were installed, with the floor boxes also containing Cat 6 connections back to a data server. This method will afford maximum flexibility to the occupant.

 

The project targeted BREEAM, and our design contributed the maximum credits from an electrical point of view – low energy lighting, automatic lighting controls, sustainable external lighting and sub-metering of electrical supplies.

NETWORK 401, BRACKLEY


Completed: December 2017

Client: Parkway MK Ltd

Occupier: various

Building overview: 8 industrial units with offices on a large site of around 500m wide, 250m long.

Mandek services: We had design and build responsibilities for the complete electrical package, including containment, general & emergency lighting, fire alarm, power, mains distribution and external lighting.

 

An important aspect for the client was a level of consistency and uniformity across the project, which was made difficult due to the differing dimensions of each unit. However, after a thorough design process, effective on-site management and careful installation, we were able to achieve a finish in which every unit had the same aesthetic, products and quality.

 

We received great feedback from the client and project consultant, and have since been awarded two further projects with the same team.

SELCO THIRD AVENUE, MILTON KEYNES


Completed: August 2017

Client: Parkway MK Ltd

Occupier: W&H Peacock - http://www.peacockauction.co.uk/

Building Overview: New build dedicated auction house with double height selling rooms, storage facility, café, gallery, office space and secure stores.

Mandek Services: We provided full design and build services for the electrical package, including mains distribution, containment, lighting, fire alarm, security, power and external lighting.

 

We initially carried out a value engineering exercise due to the original specification being outside of the client’s budget, and from this we were able to develop a scheme that was within budget but also met the exacting requirements of a modern-day auction house.

 

The building featured several areas with complex ceiling details, including a café area with an MF ceiling built at 3 different heights. This led to challenges in the design of the lighting and fire alarm, and also meant that communication with other trades on site (i.e. plasterboarders) was key to a good installation.

 

Externally, we designed a lighting scheme that met all industry and project-specific standards, and also blended into the architecture of the building through careful consideration of colours and positioning of fittings.

THE KENNEL CLUB OFFICE, AYLESBURY


Completed: April 2017

Client: Parkway MK Ltd

Occupier: The Kennel Club - http://www.thekennelclub.org.uk/

Building Overview: New build high spec office building.

Mandek Services: We were employed on a design and build contract covering all of the electrical services for the building, including mains distribution, lighting, fire alarm, intruder alarm, door access, CCTV, power and external lighting.

 

This project required several months of design and planning prior to any work on site, due to the complex nature of the installation. The architect’s vision was for exposed structure and services throughout, and we were also asked to install all containment in a raised access floor above the slab. The result of this was that coordination of services was a major challenge, as we had to design each service to the particular industry standards and make everything work together in a coordinated, uniform way. The final result was absolutely stunning, we were very happy with the way the services came together and we received really good comments from various people involved in the project.

 

The lighting system was LED throughout, with a centralised DALI network to offer flexible control to the end user. We were particularly happy with the lighting in the meeting rooms, which included recessed downlights, feature pendants and a scene switch with several pre-programmed light settings.

 

The external lighting system was made up of wall mounted fittings for pedestrian areas and column mounted fittings for the car park, and was designed to meet the requirements of various standards – CIBSE LG6, Secured By Design, SLL Guide to Limiting Obtrusive Light, as well as planning requirements of the local authority. The biggest challenge was to achieve the uniformity requirements of Secured By Design, whilst not overpowering the scheme with light, but we were able to achieve this through careful design on DIALux.

BRACKMILLS, NORTHAMPTON


Completed: December 2016

Client: Parkway MK Ltd

Occupier: Various (Greggs, HSS Hire, Screwfix etc.)

Building Overview: 14 new industrial units, with 1 as a Cat B fit-out and the remainder as base-build installations.

Mandek Services: We were employed on a design and build basis for the electrical package in all units and for the external lighting in the car park areas and access road. Within the Cat B fit-out, we provided a full LED lighting scheme, a fully compliant emergency lighting system, a category L1 fire alarm system, and all other power and distribution services. The finish of the project was very good, both from an electrical point of view and an overall point of view. This project is now considered to be exemplary within the wider Brackmills Industrial Estate.

PAPA JOHN'S, MILTON KEYNES


Completed: May 2016

Client: Parkway MK Ltd

Occupier: Papa John's UK http://www.papajohns.co.uk/about-us/better-pizza.aspx

Building Overview: A refurbishment of a large office/manufacturing building that acts as the UK headquarters for one of the largest take-away pizza companies in the country.

Mandek Services: Our remit was to strip out the existing services from the office part of the building and provide full design and build services for a new electrical installation, including mains, power, data, lighting, external lighting and fire alarm. Some of the challenges that we overcame during the project were as follows: carrying out our work whilst maintaining the manufacturing facility in full operation, installation of a complex data room with a UPS system and gas suppression system, coordination with other services in some very tight spaces within the existing structure. The LED lighting system that we designed fully in-house was considered good enough to be worthy of a case study by the manufacturer, Thorn, which can be found on their website.

STOKENCHURCH UNITS B&D, STOKENCHURCH



Completed: January 2016

Client: Parkway MK Ltd

Occupier: DPM - http://www.dpm.com/

Building Overview: Two new industrial units with large warehouses and attached offices.

Mandek Services: Our contract was the design and build of the office and warehouse fit outs, as well as external lighting, which were design to a BREEAM Very Good standard. The offices were designed to be as flexible as possible, with a modular plug-in lighting system and floor boxes fed from an underfloor busbar system. An LED lighting system was installed within the warehouse, which was designed to provide light into the aisles between the tenant's racking. The external lighting was a particular challenge on this project, as the buildings were constructed in an Area of Outstnading Natural Beauty (AONB), so our design had to meet the client's requirements, the requirements of BREEAM and also the very strict requirements of the planning authority. This was achieved through extensive communication and a clear, considered approach to the design.

BLUM UK, MILTON KEYNES


Completed: December 2015

Client: Parkway MK Ltd

Occupier: Blum UK - http://www.blum.com/gb/en/

Building Overview: An extension to an existing office area to create a new showroom/exhibition space and larger office areas. This extension was actually built within the existing structure of a warehouse.

Mandek Services: We were employed on a design and build basis to provide a mixture of fit out and base build works in different areas of the building. There were various unusual elements of the installation that needed special attention, such as a netwrork of underfloor cable trunking installed to a tolerance of 1mm, a requirement for standalone emergency light fittings that were almost totally unobtrusive, and exposed services below the soffit that needed to be coordinated at an early stage of the design process.

SITE E NORTH, MILTON KEYNES


Completed: September 2015

Client: Parkway MK Ltd

Occupier: None

Building Overview: An architecturally stunning new two-storey office building with open plan office space, double height atrium, tea points and ancillary spaces. This was built as a speculative project for potential future occupation.

Mandek Services: Our contract was on a design and build basis to deliver a high spec fit out to the office and external lighting to the car park. The internal office spaces benefitted from daylight dimmable LED lighting and a floor box system for flexible working. The lighting in the atrium was designed to sit softly into the space in order to compliment the open, bright approach taken by the architect.

ROUTECO UNIT B, MILTON KEYNES


Completed: July 2015

Client: Parkway MK Ltd

Occupier: Freeths - http://www.freeths.co.uk/Milton-Keynes

Building Overview: A new two-storey office building, including a large open plan office on the first floor, cellular offices on the ground floor, tea points and ancillary spaces.

Mandek Services: We were originally appointed on a design and build contract for the base build only, but this dveloped into a full fit out after a tenant was found. This resulted in large-scale changes midway through the installation, which we dealt with by working closely with the main contractor, interior designer and other trades. The lighting scheme was generally LED throughout, with feature lighting in the reception and tea points. The mains was installed to meet the metering requirements of BREEAM and had a connection to a PV array.

BENTLEY BRIDGE, WOLVERHAMPTON


Completed: January 2015

Client: Parkway MK Ltd

Occupier: Midlands Truck and Van - http://www.midlandstruckvan.com/

Building Overview: A new commercial truck and van facility, which included a fully fitted out servicing workshop and attached offices. The project also included a seperate industrial unit that was built as a speculative base build.

Mandek Services: Design and build for the full fit out works of the commercial facility and base build of the industrial unit. An LED lighting system was installed throughout and was wired to a central controller to allow flexible control of the lighting by the occupiers. The mains installation included metering to BREEAM standard and a connection to a PV array. The showroom was fully fitted out with professional servicing equipment, such as VOSA bays and dock levelllers, and Mandek provided supplies for this.

Share by: